2014-4-25
Wright j5 9radial
start |
2014-5-15
front cover |
2014-5-30
crank case |
2014-6-25
oil tank |
2014-7-11
blower house |
2014-8-12
planetary gear housing |
2014-9-5
around the impeller |
2014-9-19
around the impeller 2 |
2014-10-10
gear box |
2014-11-08
cam ring |
2014-11-21
crank shaft |
2014-12-2
keys on the crank shaft |
2014-12-16
cylinder liner |
2015-1-15
CNC |
2015-2-12
Milling machine
CNC conversion |
2015-3-3
cylinder |
2015-3-20
slave rod
struggling |
2015-3-31
slave rod
struggling part2 |
2015-4-17
cnc milling machine 2 |
2015-5-12
slave rod |
2015-6-12
master rod |
2015-7-13
cylinder head |
2015-8-10
summer vacation |
2015-9-1
valve guide |
2015-9-25
valve
|
2015-10-2
Bendigo model engineering exhibition |
2015-10-15
miscellaneous around valve |
2015-10-23
air blower |
2015-11-10
rocker arm |
2015-11-30
miscellaneous around the rocker arm
|
2015-12-21
valve lifter guide |
2016-1-14
recovery shots 1 |
2016-2-1
milling machine again |
2016-2-9
hand@paddle
|
2016-2-25
rocker arm again |
2016-3-14
belt drive |
2016-3-31
rocker box |
2016-4-15
piston and piston pin |
u
2016-5-12
greetings from Norway |
2016-5-20
piston ring |
2016-6-7
ditributor |
2016-7-1
intake and exhaust pipe
part1 |
u
2016-8-1
intake and exhaust pipe
part2 |
2016-8-19
intake and exhaust pipe
polishing |
2016-8-23
microscope adapter |
2016-9-2
completed |
2016-9-9
gaskets |
2016-9-20
cylinder fixing bolt holes |
2016-10-2
stud bolt |
2016-10-11
rotary tumbler |
2016-10-17
shrink fit |
2016-10-25
cylinder skirt |
2016-11-1
cylinder lap |
2016-11-11
crank case correction |
2016-11-17
fine adjustment around
the valve |
2016-11-24
Melbourne model
engineering exhibitio |
2016-12-01
intake and exhaust port |
2016-12-12
valve |
2016-12-26
gasket |
2017-1-12
engine mount part1 |
2017-1-31
engine mount part2 |
2017-2-9
engine mount part3 |
2017-2-25
assemble-1 |
2017-3-11
assemble-2 |
2017-3-27
asssemble-3 |
2017-4-12
trouble shooting 1 |
2017-4-17
spring full bloom |
2017-5-6
piston ring 3 |
2017-5-15
piston 2 |
2017-5-20
piston ring 4 |
2017-6-1
push rod and
compression test |
2017-6-13
assemble 4 |
2017-6-24
assemble@5 |
2017-7-14
assemble 6 |
2017-8-8
start to run |
2017-8-18
running |
2017-9-8
super charger, defeated |
2017-9-15
super charger, recovered |
2017-9-19
test run again |
2017-10-3
engine stand 1 |
2017-10-12
engine stand 2 |
2017-10-23
float chamber |
2017-11-9
throttle lever |
2017-11-14
big misunderstand and
small revision |
2017-11-26
push rod cover |
2017-12-16
plug cap and transistor ignition |
2018-1-11
running the engine |
2018-2-8
completed |